Deerness Title Graphic

Case Study Details





Benfieldside Primary School


Date : April 2008
The project involved removal of existing vertical bar fence and replacing with a 1.8 metre high mesh security system fixed to cranked posts projecting the fence flush with the edge of the boundary wall. Incorporated within were; single pedestrian access gates and double leaf vehicular access gates.